История

2016-2017

Record grain throughput – 3.3 mln tonnes.
As a part of the Grain Terminal KSK investment program, a contract was signed with the Federal State Unitary Enterprise “Rosmorport” on safety and security of marine navigation and KSK throughput capacity increase by 1.5 mln tonnes per year.
Preparationof normative documents for throughput capacity increase. 

2014-2015

Record grain throughput – 2.8 mln tonnes.
KSK approved the development course till 2019.

2013

  • May: Completed construction of the railroad link which increased the transshipment capacity to 3.5 mln. tons.

2012

  • KSK among other DELO-GROUP stevedore assets was consolidated into a holding company DELOPORTS LIMITED.

2011

  • 3 silos with storage capacities of 3,300 tons each and band conveyor to berths put into operation increasing capacity to 2 mln. tons.

2010

  • Launch of investment program aimed at expansion of grain transshipment capacity, increase of storage capacity and construction of rail link.

2006-2010

  • DELO-GROUP acquired KSK terminal area and consolidated it with the berth rental rights into a single entity.
  • Launch of the grain transshipment operations at KSK (1)
  • Development of the project documentation for brand new 3.5 mln. tons grain transshipment terminal at KSK.
  • (1) Grain transshipment to smaller vessels via direct unloading of incoming trucks; annual transshipment capacity of approximately 0.5 mln. tons.