Infrastructure
- Storage equipment
-
13.6 kt silo
-
9PC.quantity
-
123kttotal capacity
-
2013–2020yy.commissioning
Manufacturer: Sukup Manufacturing -
-
10.1 kt silo
-
8PC.quantity
-
81kttotal capacity
-
2012–2020yy.commissioning
Manufacturer: Sukup Manufacturing -
-
3.0 - 3.3 kt silo
-
5PC.quantity
-
16kttotal capacity
-
2011–2020yy.commissioning
Manufacturer: SKE-Specst, Prado -
- Intraport crane equipment
-
Shiploader
-
3PC.amount
-
2400t/hthroughput (3 x 800 tons per hour)
-
2011, 2023yy.commissioning
Manufacturer: Neuero -
-
Onshore belt conveyor (open type)
-
3PC.amount
-
2400t/hthroughput (3 x 800 tons per hour)
-
2011, 2023yy.commissioning
Manufacturer: Neuero -
-
Tape and chain conveyor (closed type)
-
3PC.amount
-
2400t/hthroughput (3 x 800 tons per hour)
-
2011, 2023yy.commissioning
Manufacturer: Neuero -
-
Multi-bucket conveyor
-
3PC.amount
-
2400t/hthroughput (3 x 800 tons per hour)
-
2011, 2023yy.commissioning
Manufacturer: Neuero -
-
Laboratory equipmentManufacturer: Chopin, Foss Analytical
-
Equipment for receiving cargo by road
-
1200throughput
-
2011y.commissioning
Manufacturer: InterSystems + AGI -
-
Equipment for receiving cargo by road
-
2400throughput
-
2013y.commissioning
Manufacturer: InterSystems + AGI -
In June 2013, KSK reached an agreement with Rolf Logistics to launch on terminal for transshipment of Ro-Ro cargo (imported machines) from September 2013.
In August 2013, after carrying out land surveying works, The group launched a Ro-Ro transshipment complex in test mode cargo on the vacated territory of KSK.
The new Ro-Ro complex was commissioned in accordance with project schedule. Transshipment of imported machines has been launched (in partnership with Rolf Logistics).
A special berth for Ro-Ro cargo and a platform for storage of cars.
-
10thous.cars per year throughput
-
350autototal capacity
The railway park was built in 2013 and renovated in 2019 year.
Dedicated access to the railway network from Novorossiysk transport hub to the grain terminal.
-
6wagons possibly process at a time on 3 ways
-
2.4thous.
tons/htotal capacity
Direct access to the railway park for monitoring and maintaining proper path states.
-
180wagons per day railway throughput
The only grain terminal with access from the federal highway M-4 "Don".
Efficient logistics for the delivery of goods to the port.
Automated system for determining the quality of grain.
Uninterrupted operation of railway and auto unloading.
-
3auto reception lines
Own auto storage area on the territory of the terminal.
-
70grain carriers parking lot
-
700grain carriers per day