Investment projects

Investment projects

Investment projects

current
realized
current

Construction of the 4th Unloading Line

Construction of the 4th Unloading Line

Construction of the 4th Unloading Line

12
million
tons
Increase in grain transshipment capacity
250
thousand
tons
Expansion of grain storage capacity
1,000
trucks
per day
Increase in cargo reception speed by road transport
7,000
DWT
Organization of cargo reception from the sea for vessels
Installation of the fourth ship-loading machine
Installation of the first ship-unloading machine
realized

KSK grain terminal development program

KSK grain terminal development program

construction of the berth 40a and dredging up to the mark 14.4 m
dredging up to the mark 13.5 m at the berth # 40a
220
thous.
tons
expansion of capacities for grain storage
simultaneous mooring of two Panamax vessels
600
car rental
per day
increasing the speed of cargo acceptance by rail and road
7
million
tons
increase in grain handling capacities

Complex construction for grain handling

Complex construction for grain handling

12 silos total capacity 116 000 tons
1 600
t/hour
increasing the speed of loading onto the ship
commissioning of a plant for receiving grain with vehicles on two driveways and construction of a transport gallery to berths No. 40, 41
3,5
mln.
tons
increase in terminal capacity

Railway complex construction

Railway complex construction

construction of berth no. 40a and dredging up to marks 14.4 m
direct access to the railway park to control and maintain proper path conditions
6
wagons can be processed at a time on 3 ways
150
wagons per day railway throughput
2 400
tons/h
wagons per day railway throughput

Complex construction for transshipment of KSK vehicles

Complex construction for transshipment of KSK vehicles

500
auto
capacity of one-time storage sites
10 000
auto / r
throughput